HOPPER · DATA CENTER

NVIDIA H100 for demanding AI workloads

80 GB of HBM3 memory for workloads where the memory budget shapes the architecture. Plan your training or inference server around the model, dataset and GPU topology.

View configurations

YOUR SERVER

Build around your workload

GPU memory is one part of the server. Specify CPU, system RAM, storage and region to check the complete configuration.

  • Model size and memory budget
  • CPU, RAM and dataset storage
  • Region and deployment requirements

WORKLOADS

When memory matters most

01

Training

Allocate memory for weights, optimizer state and activations. Multi-GPU training also needs a suitable interconnect.

02

LLM inference

Plan VRAM for the model and KV cache together. Context length and concurrent requests influence memory demand.

03

Scientific computing

Match the numerical precision and CUDA software requirements to your calculation before choosing the host.

LOCATION

Choose a region for your workload

Keep compute close to your data and users. Capacity is checked for the selected model and location.

EU

Europe

Availability on request

US

USA

Availability on request

ASIA

Asia

Availability on request

COMPARE

Consider a different memory budget

All GPU models →
Ampere80 GB

NVIDIA A100

Established CUDA workloads and model training

Memory
HBM2e
Status
On request
Price on requestConfiguration and region to be confirmed
Explore model
Hopper141 GB

NVIDIA H200

Memory-intensive LLM inference and scientific computing

Memory
HBM3e
Status
On request
Price on requestConfiguration and region to be confirmed
Explore model
Ada Lovelace24 GB

NVIDIA RTX 4090

Prototyping, image generation and rendering

Memory
GDDR6X
Status
On request
Price on requestConfiguration and region to be confirmed
Explore model

FAQ

Before choosing

NVIDIA specifications →
Which H100 variant is described?

The reference specification is H100 SXM 80 GB. PCIe and NVL variants differ; the precise GPU variant must be confirmed in the server configuration.

Does 80 GB guarantee my model will fit?

No. Weights, precision, activations and cache share the memory budget. Check your framework and test the intended workload.

Can I request several GPUs?

Yes, include GPU count and interconnect requirements in your request. Capacity and topology need confirmation before deployment.

YOUR CONFIGURATION

Request an infrastructure quote

Choose resources and operating time. We will confirm a price for your configuration.

Each resource has its own listed configuration. Multiple GPU servers do not form an NVLink cluster. Monthly rates cover the full billing period; storage and traffic outside the configuration are not included.